Sri Lanka Electricity Act, No. 36 of 2024
අදාළ ප්රදේශ: මුළු රටටම
ගැසට් පත්රයේ පාඨය
පහත පාඨය ගැසට් පත්රයේ ඉංග්රීසි සංස්කරණයෙන් වෙනසක් නොකර ගෙන ඇත. සිංහල සංස්කරණය සඳහා නිල PDF ගොනුව බලන්න.
Part I : Section (I) — General
REGULATIONS made by the Minister of Energy under section 50 of the Sri Lanka Electricity Act, No.36 of 2024 read with subsection (1) of section 21 of the aforesaid Act.
Colombo, 18th November, 2026.
Anura Karunathilaka, Minister of Energy.
Regulations
1. These regulations may be cited as the Electricity (Applications for Licences) Regulations of 2026.
2. An application for the grant or an extension of -
(a) a generation licence to generate electricity shall be in such form as specified in Part I of Schedule A to these regulations and be accompanied by the documents and information as specified in Part II of that Schedule;
(b) a captive generation licence to generate electricity primarily for the own use of licensee, shall be in such form as specified in Part I of Schedule B to these regulations and be accompanied by the documents and information as specified in Part II of that Schedule;
(c) a national system operator licence, shall be in such form as specified in Part I of Schedule C to these regulations and be accompanied by the documents and information as specified in Part II of that Schedule;
(d) a national transmission network service provider licence, shall be in such form as specified in Part I of Schedule D to these regulations and be accompanied by the documents and information as specified in Part II of that Schedule;
(e) an additional transmission licence, shall be in such form as specified in Part I of Schedule E to these regulations and be accompanied by the documents and information as specified in Part II of that Schedule;
(f) an electricity line licence, shall be in such form as specified in Part I of Schedule F to these regulations and be accompanied by the documents and information specified in Part II of that Schedule;
(g) a distribution and supply licence, shall be in such form as specified in Part I of Schedule G to these regulations and be accompanied by the documents and information as specified in Part II of that Schedule; and
(h) a trading licence, shall be in such form as specified in Part I of Schedule H to these regulations and be accompanied by the documents and information as specified in Part II of that Schedule.
3. A trading licence shall be applicable only to –
(a) entities engaged in the resale of electricity within condominiums and high-rise buildings where such resale is confined to specified premises, assets, or consumers;
(b) entities engaged in the resale of electricity through electric vehicle charging stations; and
(c) entities engaged in the purchase, storage, and subsequent resale of electricity through Battery Energy Storage Systems (BESS).
4. Every application submitted under these regulations shall accompany a signed declaration in the form as specified in Schedule I to these regulations, and such application shall be made to the Public Utilities Commission of Sri Lanka (hereinafter referred to as the “Regulator”).
5. The Regulator shall have the power at its sole discretion at any time after the receipt of an application, to call upon an applicant to provide any information, documents, clarifications that it may, consider necessary on the contents of the application submitted, for the purpose of processing such application.
6. The application fee payable in respect of applications made for the issue or a grant of an extension of the following licences, shall be as follows: -
(a) for a generation licence
(b) for a captive generation licence
(c) for a national system operator licence
- Rs. 50,000.00
- Rs. 50,000.00
- Rs. 50,000.00
(d) for a national transmission network service provider licence - Rs. 50,000.00
(e) for an additional transmission licence
(f) for an electricity line licence
(g) for a distribution and supply licence
- Rs. 50,000.00
- Rs. 50,000.00
- Rs. 50,000.00
(h) for a trading licence (except for condominium projects) - Rs. 50,000.00
(i) for a trading licence (in respect of condominium projects) - Rs. 10,000.00
7. Application fees shall be paid to the Regulator by cash or by an acceptable electronic payment method or bank draft, drawn in favour of the “Public Utilities Commission of Sri Lanka” and documentary proof of such payment shall be submitted along with the application.
8. In these Regulations, unless the context otherwise requires:
“Act” means the Sri Lanka Electricity Act, No. 36 of 2024;
“applicant” means the person or body of persons who is or are making an application under the provisions of the Act for the grant or an extension of a licence, as the case may be;
“high rise building” means a building structure comprising of independent units or parcels with common elements and shared services, served by a primary utility intake point and where common utilities including electricity are distributed, metered, or resold internally to individual unit owners or occupiers; and “Public Utilities Commission of Sri Lanka” means, the Public Utilities Commission of Sri Lanka established under the Public Utilities Commission of Sri Lanka Act, No. 35 of 2002.
9. The Electricity (Applications for Licences and Exemptions) Regulation, 2009, published in Gazette Extraordinary No. 1617/34 of September 3, 2009 is hereby rescinded without prejudice to anything previously duly done thereunder.
SCHEDULE A
Part I Application Form for the Issue of a Generation Licence
1. Name of the applicant:
2. The legal status of the applicant:
3. Official address and the contact information of the applicant:
4. Name, address and place of incorporation of a parent company (if any):
5. Full names of all the current members of the governing body of the applicant:
6. The names of all the shareholders of the company and the number of shares held by each such member, if applicable:
7. Details of the ultimate beneficial owner(s) of the applicant, if different from the shareholders listed above, if applicable:
8. Details of any direct or indirect ownership, control, or affiliation with entities engaged in electricity transmission, distribution, trading or procurement:
9. Name and designation of the person to whom enquires may be addressed in relation to this application, together with an address for correspondence (if different from item 3 above) and other contact details:
10. Desired date on which the licence is to become operative:
11. Details of approvals obtained or proposed to be obtained, and agreements executed or proposed to be executed, in respect of the activities for which the licence is being applied:
12. A list of the administrative districts in which the generating plant(s) and associated infrastructure are or will be located:
13. Whether the licence is being applied for the construction of a new plant or for the expansion of an existing plant or extension of the operation of an existing plant:
14. Provide details of any previous or current application made by the applicant for the issue of a licence under the Sri Lanka Electricity Act, No. 20 of 2009 and the Sri Lanka Electricity Act, No. 36 of 2024, and where applicable, state -
(a) where a licence was issued, details of the licence granted, and all activities carried out by the applicant under such licence;
(b) where an application was rejected, the reasons for such rejection;
(c) where a licence was revoked or withdrawn, the reasons for such revocation or withdrawal; and
(d) where an application is pending or under consideration, the current status of such application.
Part II Documents to Accompany an Application made for the Issue of a Generation Licence
1. If the applicant is -
(a) a body established by an Act of Parliament, a copy of such Act;
(b) a company, a certified copy of the certificate of incorporation issued and of the Memorandum and Articles of Association of the company;
(c) a society registered under the Co-operative Societies Law, No. 5 of 1972, a certified copy of the certificate of registration issued and of the by-laws of such society;
(d) a partnership, a certified copy of the certificate of registration issued by an appropriate authority under any law or Statute relating to the registration of business names; or
(e) any unincorporated body of persons, the constitution of such unincorporated body.
2. The following documents as and where applicable -
(a) annual returns for the immediately preceding year;
(b) statement of account for the current year; and
(c) audited accounts of the previous two years.
3. Details of technical expertise and human resources available with the applicant, including key operational personnel, to enable it to carry on its activities in respect of which the licence is being applied for;
4. Estimates of net annual cash flows, including costs, sales, and revenues, for the entire duration of the licence, sufficient to demonstrate the financial viability and feasibility of the activities under such licence;
5. Details of project financing and available funding for the duration of the licence, adequate to support the applicant in carrying out the proposed activities, together with the assumptions on which the figures are based;
6. Details of any expected substantial capital outflows, including major rehabilitation or decommissioning costs;
7. Any parent company or bank guarantees in favour of or given by the applicant;
8. A statement outlining how the applicant proposes to comply with and adhere to all applicable technical and regulatory instruments, including regulations, rules, codes, methodologies, standards, manuals, and similar requirements;
9. Provide details of the applicant’s internal safety governance arrangements in relation to the proposed activities, including -
(a) the overall safety management framework and policies in place;
(b) the organizational structure for safety, clearly identifying roles, responsibilities, and lines of accountability;
and
(c) the systems and procedures established for the identification, reporting, investigation, and review of electrical accidents, incidents, and safety-related non-compliances, including mechanisms for corrective and preventive actions.
10. A statement describing any lands and servitudes which the applicant has acquired or proposes to acquire in relation to the proposed activities;
11. Details of the generating plant(s) and proposed operations –
(a) name(s) of the specific generating plant(s) intended to be operated under the licence, including whether the plant comprises a single technology or a combination of generation and energy storage components (where applicable);
(b) location of each generating plant, with an adequate description sufficient to clearly identify the site, including reference to town, administrative district, postal address, and supported by map or maps identifying the location of all generating plants to which the application relates;
(c) description of the method of generation, including details of how each plant will be fueled or driven, specifying both primary and backup fuel sources (where applicable);
(d) proposed generation capacity (MW) for which the licence is being applied for, and the maximum power (MW) expected to be available from each generating plant at any given time, clearly indicating any contribution from energy storage systems, where applicable;
(e) rated capacity (MW), type, number of generating units, and the capacity of each generating unit within each generating plant, including a general identification of the technology type (e.g. renewable, thermal, fuel-cell-based, storage-assisted);
(f) aggregate energy output (GWh) expected to be available from each generating plant during any given year, excluding energy expected to be consumed at the plant;
(g) estimated auxiliary electricity consumption of each generating plant, expressed in: absolute terms (GWh per year), and percentage (%) of gross electricity generation, including a brief description of the major auxiliary loads (such as pumps, fans, compressors, control systems and other station services);
(h) grid and system interface details of each generating plant, including the proposed point of connection to the transmission or distribution network, connection voltage level, interface facilities, and any grid-related infrastructure required for the evacuation of power;
(i) expected commissioning date or dates of each generating plant (or, where already commissioned, the actual commissioning date or dates), including any phased commissioning of generation or storage components;
(j) expected operational life span of each generating plant and generation station, including any major components such as energy storage systems or fuel handling facilities, where applicable;
(k) a quantified statement of inputs to and discharges from the environment from each generating plant, together with the sources of such inputs and discharges, including, where applicable, emissions, waste streams, and other environmental interactions arising from fuel use, energy storage, or fuel handling activities;
(l) proposed commercial arrangement for the sale of generated electricity, including the counterparty and consistency with the electricity market structure under the Sri Lanka Electricity Act, No. 36 of 2024.
SCHEDULE B
Part I Application Form for the Issue of a Captive Generation Licence
1. Name of the applicant:
2. The legal status of the applicant:
3. Official address and the contact information of the applicant:
4. Name, address and place of incorporation of a parent company (if any):
5. Full names of all the current members of the governing body of the applicant:
6. The names of all the shareholders of the company and the number of shares held by each such member, if applicable:
7. Details of the ultimate beneficial owner(s) of the applicant, if different from the shareholders listed above, if applicable:
8. Details of any direct or indirect ownership, control, or affiliation with entities engaged in electricity transmission, distribution, trading or procurement:
9. Name and designation of the person to whom enquires may be addressed in relation to this application, together with an address for correspondence (if different from item 3 above) and other contact details:
10. Desired date on which the licence is to become operative:
11. Details of approvals obtained or proposed to be obtained, and agreements executed or proposed to be executed, in respect of the activities for which the licence is being applied for:
12. A list of the administrative districts in which the generating plant(s) and associated infrastructure are or will be located:
13. Whether the licence is being applied for the construction of a new captive generation plant or for the expansion of an existing captive generation plant or extension of the operation of an existing captive generation plant:
14. Provide details of any previous or current application made by the applicant for the issue of a licence under the Sri Lanka Electricity Act, No. 20 of 2009 and the Sri Lanka Electricity Act, No. 36 of 2024 and where applicable, state -
(a) where a licence was issued, details of the licence granted and all activities carried out by the applicant under such licence;
(b) where an application was rejected, the reasons for such rejection;
(c) where a licence was revoked or withdrawn, the reasons for such revocation or withdrawal; and
(d) where an application is pending or under consideration, the current status of such application.
Part II Documents to Accompany an Application made for the Issue of a Captive Generation Licence
1. If the applicant is -
(a) a body established by an Act of Parliament, a copy of such Act;
(b) a company, a certified copy of the certificate of incorporation issued and of the Memorandum and Articles of Association of the company;
(c) a society registered under the Co-operative Societies Law, No. 5 of 1972, a certified copy of the certificate of registration issued and of the by-laws of such society;
(d) a partnership, a certified copy of the certificate of registration issued by an appropriate authority under any law or Statute relating to the registration of business names; or
(e) any unincorporated body of persons, the constitution of such unincorporated body.
2. The following documents as and where applicable -
(a) annual returns for the immediately preceding year;
(b) statement of account for the current year; and
(c) audited accounts of the previous two years.
3. Details of technical expertise and human resources available with the applicant, including key operational personnel, to enable it to carry on its activities in respect of which the licence is being applied for;
4. Estimates of net annual cash flows, including costs, sales, and revenues, for the entire duration of the licence, sufficient to demonstrate the financial viability and feasibility of the activities under such licence;
5. Details of project financing and available funding for the duration of the licence, adequate to support the applicant in carrying out the proposed activities, together with the assumptions on which the figures are based;
6. Details of any expected substantial capital outflows, including major rehabilitation or decommissioning costs;
7. Any parent company or bank guarantees in favour of or given by the applicant;
8. A statement outlining how the applicant proposes to comply with and adhere to all applicable technical and regulatory instruments, including regulations, rules, codes, methodologies, standards, manuals, and similar requirements;
9. Provide details of the applicant’s internal safety governance arrangements in relation to the proposed activities, including -
(a) the overall safety management framework and policies in place;
(b) the organizational structure for safety, clearly identifying roles, responsibilities, and lines of accountability;
and
(c) the systems and procedures established for the identification, reporting, investigation, and review of electrical accidents, incidents, and safety-related non-compliances, including mechanisms for corrective and preventive actions.
10. A statement describing any lands and servitudes which the applicant has acquired or proposes to acquire in relation to the proposed activities;
11. Details of the captive generating plant(s) and proposed operations -
(a) name(s) of the specific generating plant(s) intended to be operated under the licence, including whether the plant comprises a single technology or a combination of generation and energy storage components (where applicable);
(b) location of each generating plant, with an adequate description sufficient to clearly identify the site, including reference to town, administrative district, postal address, and supported by map or maps identifying the location of all generating plants to which the application relates;
(c) description of the method of generation, including details of how each plant will be fuelled or driven, specifying both primary and backup fuel sources (where applicable);
(d) proposed generation capacity (MW) for which the licence is being applied for, and the maximum power (MW) expected to be available from each generating plant at any given time, clearly indicating any contribution from energy storage systems, where applicable;
(e) rated capacity (MW), type, number of generating units, and the capacity of each generating unit within each generating plant, including a general identification of the technology type (e.g. renewable, thermal, fuel-cell-based, storage-assisted);
(f) aggregate energy output (GWh) expected to be available from each generating plant during any given year, excluding energy expected to be consumed at the plant;
(g) estimated annual electricity generation allocated to captive consumption (GWh per year), and any surplus electricity proposed to be exported (if permitted), expressed both in absolute terms (GWh per year) and as a percentage (%) of total gross electricity generation;
(h) estimated auxiliary electricity consumption of each generating plant, expressed in: absolute terms (GWh per year), and percentage (%) of gross electricity generation, including a brief description of the major auxiliary loads (such as pumps, fans, compressors, control systems and other station services);
(i) expected commissioning date or dates of each generating plant (or, where already commissioned, the actual commissioning date or dates), including any phased commissioning of generation or storage components;
(j) expected operational life span of each generating plant and generation station, including any major components such as energy storage systems or fuel handling facilities, where applicable;
(k) a quantified statement of inputs to and discharges from the environment from each generating plant, together with the sources of such inputs and discharges, including, where applicable, emissions, waste streams, and other environmental interactions arising from fuel use, energy storage, or fuel handling activities;
(l) proposed arrangements for selfconsumption of generated electricity, and details of any intended export of surplus electricity (if permitted);
(m) if applicable, grid and system interface details of each generating plant, including the proposed point of connection to the transmission or distribution network, connection voltage level, interface facilities, and any gridrelated infrastructure required for the evacuation of power;
(n) description of the captive load(s), including the facility or facilities to be supplied, ownership or control relationship between the generating plant and the load, and confirmation that generation is primarily for own consumption.
SCHEDULE C
Part I Application Form for the Issue of a National System Operator Licence
1. Name of the applicant:
2. The legal status of the applicant:
3. Official address and the contact information of the applicant:
4. Full names of all the current members of the governing body of the applicant:
5. The names of all the shareholders of the company and the number of shares held by each such member:
6. Name and designation of the person to whom enquiries may be addressed in relation to this application, together with an address for correspondence (if different from item 3 above) and other contact details:
7. Desired date from which the licence is to become operative:
8. Details of approvals obtained or proposed to be obtained, and agreements executed or proposed to be executed, in respect of the activities for which the licence is being applied for:
Part II Documents to Accompany an Application Made for The Issue of a National System Operator Licence
1. A certified copy of the certificate of incorporation issued and of the Memorandum and Articles of Association of the company;
2. The following documents as and where applicable -
(a) annual returns for the immediately preceding year;
(b) statement of account for the current year; and
(c) audited accounts of the previous two years.
3. Details of technical expertise and human resources available with the applicant, including key operational personnel, to enable it to carry on its activities in respect of which the licence is being applied for;
4. A statement outlining how the applicant proposes to comply with and adhere to all applicable technical and regulatory instruments, including regulations, rules, codes, methodologies, standards, manuals, and similar requirements;
5. Provide details of the applicant’s internal safety governance arrangements in relation to the proposed activities, including -
(a) the overall safety management framework and policies in place;
(b) the organizational structure for safety, clearly identifying roles, responsibilities, and lines of accountability; and
(c) the systems and procedures established for the identification, reporting, investigation, and review of electrical accidents, incidents, and safety-related non-compliances, including mechanisms for corrective and preventive actions.
6. A statement describing any lands and servitudes which the applicant has acquired or proposes to acquire in relation to the proposed activities;
7. Provide information, supporting documents, and explanatory statements demonstrating how the applicant will technically and operationally perform the functions of the National System Operator, including the following: -
(a) System Operation Functions -
(i) real-time system operation, scheduling, dispatch, and balancing of electricity on the National Grid;
(ii) coordination arrangements with generation licensees, transmission licensees, distribution licensees, and other system users;
(iii) system monitoring, outage coordination, and short-term and medium-term operational planning.
(b) System Control and Dispatch Arrangements -
(i) system control capability for real-time operation;
(ii) dispatch methodologies and operational decision-making processes;
(iii) arrangements for maintaining system frequency, voltage control, and operating reserves.
(c) Grid Security, Reliability, and Emergency Management -
(i) grid security and reliability standards applied by the applicant;
(ii) contingency planning and management of system disturbances;
(iii) emergency response and system restoration procedures, including black-start arrangements where applicable.
(d) Metering, Data, and Information Systems -
(i) metering and data acquisition arrangements necessary for system operation;
(ii) supervisory control and data acquisition (SCADA), energy management system (EMS), forecasting, and other Information Technology (IT) systems used for monitoring and control;
(iii) information exchange and communication arrangements with licensees and other system users;
(iv) cybersecurity governance, data confidentiality and resilience arrangements.
(e) System Demand and Energy Forecasting -
(i) projected annual maximum system demand (GW) to be operated and balanced by the National System Operator;
(ii) projected annual energy (GWh) to be operated and balanced;
(iii) methodologies and assumptions used for demand and energy forecasting;
(iv) a list of system users with whom the applicant currently coordinates or proposes to coordinate system operation activities.
8. A statement and supporting documentation demonstrating how the applicant will ensure operational independence, neutrality, and non-discriminatory conduct in the performance of National System Operator functions, including governance arrangements and conflict-of-interest controls;
9. Details of arrangements for regulatory compliance, internal controls and audit of National System Operator activities.
SCHEDULE D
Part I Application Form for the Issue of a National Transmission Network Service Provider Licence
1. Name of the applicant:
2. The legal status of the applicant:
3. Official address and the contact information of the applicant:
4. Full names of all the current members of the governing body of the applicant:
5. The names of all the shareholders of the company and the number of shares held by each such member:
6. Name and designation of the person to whom enquiries may be addressed in relation to this application, together with an address for correspondence (if different from item 3 above) and other contact details:
7. Desired date from which the licence is to become operative:
8. Details of approvals obtained or proposed to be obtained, and agreements executed or proposed to be executed, in respect of the activities for which the licence is being applied:
Part II Documents to Accompany an Application made for the Issue of a National Transmission Network Service Provider Licence
1. A certified copy of the certificate of incorporation issued and of the Memorandum and Articles of Association of the company;
2. The following documents as and where applicable -
(a) annual returns for the immediately preceding year;
(b) statement of account for the current year; and
(c) audited accounts of the previous two years.
3. Details of technical expertise and human resources available with the applicant, including key operational personnel, to enable it to carry on its activities in respect of which the licence is being applied for;
4. Estimates of net annual cash flows, including costs, sales, and revenues, for the entire duration of the licence, sufficient to demonstrate the financial viability and feasibility of the activities under such licence;
5. Details of project financing and available funding for the duration of the licence, adequate to support the applicant in carrying out the proposed activities, together with the assumptions on which the figures are based;
6. Details of any expected substantial capital outflows, including major rehabilitation or decommissioning costs;
7. Any parent company or bank guarantees in favour of or given by the applicant;
8. A statement outlining how the applicant proposes to comply with and adhere to all applicable technical and regulatory instruments, including regulations, rules, codes, methodologies, standards, manuals, and similar requirements;
9. Provide details of the applicant’s internal safety governance arrangements in relation to the proposed activities, including -
(a) the overall safety management framework and policies in place;
(b) the organizational structure for safety, clearly identifying roles, responsibilities, and lines of accountability; and
(c) the systems and procedures established for the identification, reporting, investigation, and review of electrical accidents, incidents, and safety-related non-compliances, including mechanisms for corrective and preventive actions.